Developed a Python-based automation tool for ASBL to streamline project scheduling. The system analyzes construction constraints, resource availability, and dependencies to generate optimized timelines automatically.
This tool reduced manual scheduling effort by 40% and minimized logic errors in the critical path method (CPM) analysis. It integrates directly with existing database formats to provide real-time updates.
Python
Pandas
Algorithm Design
Construction Management